Geothermal education, design & leasingPlumbing, HVAC & electrical →

COILED CLOSED-LOOP FIELD

Horizontal Slinky Geothermal Loops

Coiled polyethylene pipe is placed in engineered trenches to fit more pipe length into each run. Slinky fields can be useful when adequate open ground and excavation access are available.

GOOD STARTING FIT

Where this loop can make sense

Larger open lots with suitable soil, manageable restoration and enough separation from utilities, septic systems, structures and protected areas.

Lease-program note

A closed-loop horizontal slinky field is included in this site’s preliminary PremiumPath screen as a horizontal-trench concept. Final documentation, design, property, pricing and credit review still control.

Educational concept showing geothermal slinky coils arranged in parallel excavated trenches
AI-GENERATED EDUCATIONAL CONCEPT

A simplified, not-to-scale view of coiled geothermal pipe in parallel trenches. Actual trench count, depth, spacing, coil pitch and routing require site-specific engineering.

INSTALLATION SEQUENCE

How the field comes together

  1. 01

    The designer sets trench count, length, depth, spacing, coil pitch, circuits and flow using the building load and local ground assumptions.

  2. 02

    Trenches are excavated and kept safe and stable. Coils are assembled or positioned without kinks, sharp bends or damaged pipe.

  3. 03

    Specified backfill, flushing, pressure testing and surface restoration complete the field before system commissioning.

PROS

  • Avoids deep drilling
  • Can use conventional excavation equipment
  • Efficient pipe placement per trench
  • Installation is visible before backfill

TRADEOFFS

  • Needs meaningful open land
  • Large disturbed and restored area
  • Performance is sensitive to depth, spacing, moisture and soil
  • Not a shortcut for an undersized field

FIELD DOCUMENTATION

What our team documents during installation

A useful project record shows the parts of the loop installation that affect access, performance, restoration and future service. These are the field views we document for this loop type.

01
Excavated trench layout

Show scale, depth, trench spacing and protected spoil piles.

02
Pipe coils before backfill

Capture coil pitch, supports, headers and undamaged pipe.

03
Backfill and restoration

Document protective fill, compaction approach and finished grade.

Future project-photo standard: real installation photos will be added only after customer authorization is recorded and each image is checked for faces, plates, addresses and sensitive documents.

SITE VERIFICATION

Questions the field review must answer

  • Available trench footprint and equipment access
  • Soil type, moisture and seasonal conditions
  • Septic, utilities, drainage and property setbacks
  • Coil pitch, trench spacing, backfill and restoration plan

FROM SCREENING TO SITE DESIGN

Bring the right loop questions to the property.

Check my homeText 614-254-5614